2008 AMC 12A Problem 1

Attempt Problem 1 of the 2008 AMC 12A below, then check your answer against the professionally curated solution from LIVE by Po-Shen Loh. You can also try the full timed exam, view all 2008 AMC 12A solutions, or check the answer key.

All problems are used with official legal permission of the Mathematical Association of America (MAA).

1.

A bakery owner turns on his doughnut machine at 8 ⁣: ⁣308\!:\!30 am. At 11 ⁣: ⁣1011\!:\!10 am the machine has completed one third of the day's job. At what time will the doughnut machine complete the job?

1 ⁣: ⁣501\!:\!50 pm

3 ⁣: ⁣003\!:\!00 pm

3 ⁣: ⁣303\!:\!30 pm

4 ⁣: ⁣304\!:\!30 pm

5 ⁣: ⁣505\!:\!50 pm

Answer: D
Concepts:ratio and proportiondate and time
Difficulty rating: 800
Solution:

From 8 ⁣: ⁣308\!:\!30 am to 11 ⁣: ⁣1011\!:\!10 am is 22 hours 4040 minutes, or 160160 minutes, to complete one third of the job.

The whole job then takes 3160=4803 \cdot 160 = 480 minutes, or 88 hours. Adding 88 hours to 8 ⁣: ⁣308\!:\!30 am gives 4 ⁣: ⁣304\!:\!30 pm.

Thus, D is the correct answer.

Full Exam

Problem 1 in Other Years